title: "Heavy Equipment Pre-Dispatch Planning: Site Readiness and Handoffs"
url: "https://www.cowtownlogistics.com/blog/heavy-equipment-pre-dispatch-planning-site-readiness-handoffs/"
---


Table Of Contents

- [Pre-dispatch planning sequence](#pre-dispatch-planning-sequence)
- [Confirm the dispatch plan](#confirm-the-dispatch-plan)
- [Walk the truck’s path at both sites](#walk-the-trucks-path-at-both-sites)
- [When does a heavy equipment move need escort vehicles?](#when-does-a-heavy-equipment-move-need-escort-vehicles)
- [Plan the route and escorts together](#plan-the-route-and-escorts-together)
- [Set the loading and receiving handoffs](#set-the-loading-and-receiving-handoffs)
- [Agree on changes and exceptions](#agree-on-changes-and-exceptions)
- [The Takeaway](#the-takeaway)

If a truck cannot make the turn into a jobsite, an escort arrives outside the permitted travel window, or a receiving crew is unavailable, the move may need to stop while the plan is corrected. This checklist covers the coordination that happens after the shipping method, trailer, and route are chosen and before the truck is released.

For the earlier steps, such as choosing a transport method, requesting a quote, or sizing up an over-dimensional load, see our [heavy equipment shipping guide](/blog/how-to-ship-heavy-equipment-the-complete-guide/) and [oversized load planning best practices](/blog/oversized-loads-101-over-dimensional-freight-shipping-best-practices-and-considerations/).

## Pre-dispatch planning sequence

Use these checkpoints in order. The time needed depends on the route, permits, load, and site conditions, so confirm applicable deadlines and appointments for the specific move.

| Checkpoint                   | What to confirm                                                                                         |
|------------------------------|---------------------------------------------------------------------------------------------------------|
| Route and permit planning    | Permit applications, any required route inspection, and escort arrangements for each state on the route |
| Site readiness               | Access at origin and destination, loading and receiving crews, and appointments                         |
| Before the truck is released | Final dispatch details, carrier and escort contacts, and the permitted travel window                    |
| Day of departure             | Communication check between the truck, escorts, and coordinator; both site contacts reachable           |

## Confirm the dispatch plan

Before releasing the truck, compare the dispatch information with the machine and plan that are actually ready to move:

- Confirm that the equipment and attachments match the transport configuration used for the route and permit review.
- Verify that the origin and destination addresses, access instructions, appointments, and contact numbers are current.
- Make sure the assigned carrier has the current move details, approved route, permit conditions, and delivery instructions.
- Confirm that the carrier’s authority, insurance, and experience with this type of equipment match what was approved for the move.
- Before dispatch, reconfirm that the carrier assignment, rate, shipment details, and appointments are still current.
- Identify one move coordinator who can reach both sites and the carrier if a detail changes.

On our [heavy haul moves](/freight-shipping/heavy-haul-trucking/), we plan permits and route requirements and coordinate escort arrangements. Before a load is tendered, our brokers check the carrier’s licensing, insurance, safety record, and service history ([how we vet carriers](/freight-brokerage/)).

## Walk the truck’s path at both sites

The origin and destination should each confirm the truck’s approach from the public road to the loading or set-down point. A map pin is not enough to confirm access for the actual truck and trailer.

Have a site contact verify:

- Gate, driveway, and turning access for the vehicle combination
- Overhead wires, branches, signs, canopies, and other obstructions
- If overhead clearance is uncertain, do not estimate. Pause the plan and have the carrier, escort provider, permitting contact, or utility owner confirm the safe clearance and any required protection before movement.
- Ground conditions, slopes, soft surfaces, and space to stage
- Where the truck can safely stop while loading or unloading
- The route across the property from the entrance to the loading or set-down location

Ask for recent photos, a site sketch, or a call with someone who knows the property if any part of the approach is unclear. At the destination, confirm that the machine can be unloaded and moved to its final location. If the site cannot receive the truck in the planned window, agree on a new appointment or staging plan before dispatch.

## When does a heavy equipment move need escort vehicles?

Escort requirements are set by the applicable oversize or overweight permit and may vary by state, permit type, route segment, and local or agency conditions. The federal government does not issue oversize or overweight permits; states do ([FHWA permit guidance](https://ops.fhwa.dot.gov/freight/sw/permit_report/)). Escort counts and placement depend on the load’s width, height, length, and overhang.

The following examples apply to Texas moves only. For interstate shipments, the permit holder and carrier should confirm escort, route, travel-hour, and route-inspection requirements in every jurisdiction before dispatch.

Texas shows how specific these rules get. Under TxDMV’s general escort table, loads over 14 feet wide require one escort: in front on a two-lane highway or behind on a multi-lane highway. Loads over 16 feet wide require front and rear escorts on all roads. Length follows a similar pattern: one escort over 110 feet and front and rear escorts over 125 feet. A front or rear overhang over 20 feet requires a rear escort. Loads over 17 feet high require a front escort with a height pole; loads over 18 feet high require front and rear escorts, with a height pole on the front escort. When a load exceeds more than one threshold, the requirements for each dimension apply. Permit types and exceptions can also change the requirements, so check the applicable permit ([TxDMV escort requirements](https://www.txdmv.gov/motor-carriers/oversize-overweight-permits/escort-and-equipment-requirements)). Texas also requires a route inspection before permit issuance when a load exceeds 20 feet wide, 18 feet 11 inches high, or 125 feet long; TxDMV advises submitting the route-inspection request 3–5 days before the proposed movement ([TxDMV route inspections](https://www.txdmv.gov/motor-carriers/oversize-overweight-permits/texas-size-weight-limits/route-inspections)). These are Texas rules, not a national standard. Our [heavy haul permits guide](/blog/heavy-haul-and-oversized-transport-permits-what-you-need-in-2026/) covers permit types and state requirements in more detail.

## Plan the route and escorts together

The permitted route determines where escorts are needed, so plan them as one decision. If requirements differ between states on the route, confirm where escort arrangements change and who meets the load at each point.

For a move that requires escort vehicles, confirm:

- Who is arranging each escort and when the escort must be in position
- That each escort vehicle meets the equipment requirements of the states it will run in
- The truck and escort contacts, radio or phone method, and communication check before departure
- Any required agency or site notification, plus who will make it
- The authorized travel days and hours, including any weather or roadway restrictions
- What the driver and coordinator should do if a delay threatens the permitted window

Confirm the current conditions for this move rather than relying on a prior shipment’s arrangement.

## Set the loading and receiving handoffs

The people at pickup and delivery should know when the truck is expected, where it should report, and who can make a decision if site conditions are different from the plan.

Before dispatch, each location should confirm:

| Handoff            | Origin                                                                                     | Destination                                                                                 |
|--------------------|--------------------------------------------------------------------------------------------|---------------------------------------------------------------------------------------------|
| Site contact       | Name and direct number for the person meeting the truck                                    | Name and direct number for the person receiving it                                          |
| Access             | Check-in process, safety rules and PPE, open gate, safe staging area, and loading location | Check-in process, safety rules and PPE, open gate, safe staging area, and set-down location |
| Equipment and crew | Loading equipment, rigging, qualified operator, and required personnel are ready           | Unloading equipment, rigging, qualified operator, and required personnel are ready          |
| Timing             | Site hours, loading window, and any departure constraints are clear                        | Appointment, receiving window, and any installation schedule are clear                      |
| Contingency        | Contact who can approve a delay or revised pickup plan                                     | Contact who can approve a delay, staging, or revised delivery plan                          |

If the equipment needs a specific transport configuration or site handling, confirm the responsible person at each end before the truck arrives. Keep the machine, crew, and unloading equipment available in the sequence agreed with the carrier. We coordinate heavy haul moves around the permitted route, provide six or more proactive updates per load, and help align delivery sequencing and unloading with the receiving site.

## Agree on changes and exceptions

Some changes affect only an appointment. Others can affect route authorization, escort coordination, or whether a site can safely receive the equipment. Agree on an escalation path before dispatch:

1. **Pause and notify:** The driver or site contact calls the move coordinator when the route, machine configuration, access, timing, or receiving conditions change.
2. **Check what the change affects:** The coordinator contacts the carrier and relevant authority or site contact to confirm whether the permit, approved route, escort, or equipment plan remains valid.
3. **Get approval before continuing:** Resume only after the updated plan and next contact point are clear to the driver, escort, and affected site.
4. **Record the new handoff:** Share the revised arrival window and instructions with both site contacts and note who confirmed them.

Do not assume a driver can choose an alternate route or proceed with a changed load configuration under the existing approval. Confirm the requirements with the carrier and permitting authority before movement continues.

## The Takeaway

A heavy equipment road move is ready for dispatch when the current shipment plan matches the load, both sites confirm access and handling, escort and travel-window responsibilities are assigned for every state on the route, and everyone knows how to respond to a change.

If you are coordinating a heavy haul move, [contact us](/contact-us/) with the planned pickup and delivery windows and photos of each site’s approach from the public road. Our [heavy haul team](/freight-shipping/heavy-haul-trucking/) can help flag access, escort, or timing issues before the move is released.